|
FOS calculation for modified cam clay model (MCC) in FLAC 2D/3D
|
|
1
|
100
|
December 2, 2024
|
|
Shear Band Formation in FLAC2D
|
|
1
|
75
|
November 25, 2024
|
|
Creating geogrid
|
|
0
|
39
|
November 22, 2024
|
|
Plastic Hardening Model in FLAC3d
|
|
4
|
381
|
November 22, 2024
|
|
Bi-axial and Uni-axial geogrids In FLAC 3D
|
|
0
|
37
|
November 18, 2024
|
|
Meshing issue (Embankment on pile supported sub-soil)
|
|
1
|
58
|
November 12, 2024
|
|
FLAC3D and loading of .dll files
|
|
2
|
409
|
November 3, 2024
|
|
"it.history.get" gives garbage values. Why?
|
|
3
|
118
|
October 14, 2024
|
|
Geogrids (FLA C 3D)
|
|
0
|
47
|
October 10, 2024
|
|
Cam Clay: Yield envelop not reached error
|
|
0
|
68
|
September 29, 2024
|
|
Unable to Plot or See the displacement and load plots
|
|
6
|
86
|
September 24, 2024
|
|
Issue creating accurate liner for use as concrete facing
|
|
2
|
63
|
September 23, 2024
|
|
Water Table Issue
|
|
4
|
114
|
September 20, 2024
|
|
Construction Stages for MSE Wall / Embankment
|
|
1
|
54
|
September 17, 2024
|
|
Cutting a mesh in flac3D
|
|
4
|
133
|
September 5, 2024
|
|
Modeling pile as solid element (Zone)
|
|
0
|
36
|
August 29, 2024
|
|
Problem applying bonds property in PFC 2D
|
|
1
|
71
|
August 12, 2024
|
|
Coupled/De-coupled analysis
|
|
1
|
111
|
July 22, 2024
|
|
Help needed...Coupling analysis (consolidation)
|
|
0
|
123
|
June 27, 2024
|
|
Program crash (FLAC 3D) (Help needed)
|
|
2
|
452
|
June 30, 2024
|
|
Initialize stress condition between soil layers having different constitutive model
|
|
1
|
140
|
June 21, 2024
|
|
Help need: Pile and soil deformation similar?
|
|
2
|
155
|
June 18, 2024
|
|
Coupling analysis for pile supported embankment- Please share your insights
|
|
3
|
148
|
June 18, 2024
|
|
Consolidation Analysis ((pile supported embankment)-Insights?
|
|
0
|
82
|
June 11, 2024
|
|
About measuring of stress and strain at regular interval
|
|
3
|
147
|
June 10, 2024
|
|
About contact model in PFC
|
|
1
|
108
|
June 10, 2024
|
|
The Phenomena of "Cycle" in a model
|
|
1
|
99
|
June 10, 2024
|
|
Illegal geometry error (excessive deformation)
|
|
2
|
263
|
June 6, 2024
|
|
Help needed...Modeling pile as solid element (zone group) within soil block
|
|
1
|
138
|
June 6, 2024
|
|
Help needed...Initialize stress for equillibrium (mohr-coulomb layer below modified cam clay layers)
|
|
4
|
233
|
May 30, 2024
|